INDUSTRIAL BUILDINGS, REGENERATION OF INDUSTRIAL AREAS


OKI PRODUCTION FACILITY, UK PROJECT ARCHITECT & TEAM LEADER, KEPPIE DESIGN Ltd 


A sigle span 90m Kalzip standing seam roof system used over the manufacturing facility and the warehouse. The service modules on the roof are manufactured off site to reduce cost and improve program. Natural cross-ventilation through a fully automated high-level window system used in offices.


Copyright © 2025 Pavlina Koeva - Ratcheva Architect, All rights reserved

PHARMACEUTICAL BUILDING TABLET 3, BULGARIA WITH A TEAM IN THE UK - built

INDUSTRIAL COMPLEX “ASAREL”, BULGARIA WITH A TEAM, UACG BULGARIA - built
 
FACTORY “BULGARIA”, PLOVDIV WITH PROF ARCH. METHODY PISARSKI, UACG - built

OFFICE BUILDING & CONTROL CENTRE, POWER STATION ‘MARITZA IZTOK', BG - built
 
BELENE POWER PLANT:  ENERGOPROJECT, BULGARIA, COMPETITION - 1st Prize


PUMPED STORAGE HYDRO POWER PLAN PSHPP 'CHAIRA', BULGARIA - built

Chaira  has started as a student Diploma project in the Faculty of Architecture, UACEG to continued as an Architect, part of a multidisciplinary team in “Energoproject”. The diploma model was exhibited at the Thessaloniki International Fair 1982. 


The Main entrance building and the underground control station were designed in collaboration with Japanese consultantsThe control equipment, incl. two operating control rooms as well as the first pump-generator were supplied from Japan. 


Underground building cavity 48/24/120м, the biggest in Europe at the time included environmental studies and the physiological and psychological impact factors of the underground buildings design.

AWARDS

Diploma for Industrial Buildings Design, National review of Bulgarian Architecture

Diploma for Industrial buildings for Student Diploma work, UAB


Copyright © 2025 Pavlina Koeva - Ratcheva Architect, All rights reserved




   Copyright ©  2025 Pavlina Koeva - Ratcheva Architect, All rights reserved